FAQ
What is the Multi-Building Connection Excavation Permit service?
This service allows service providers across the Kingdom (e.g., telecommunications, electricity, and water companies) to request a new type of excavation permit (Multi-Building Connection Excavation Permit), covering multiple building connections. The process includes coordination, approval, permit issuance, excavation execution, and site closure.
FAQ
What are the key requirements for applying for a Multi-Building Connection Excavation Permit?
The key requirements include:
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
FAQ
Will an entire project be rejected if some excavation sites receive remarks, or can the applicant modify and resubmit the request?
Some excavation sites may be accepted while others are rejected, with feedback provided to the project owner. The applicant will have the option to address the remarks and resubmit the request for reconsideration.
FAQ
What options are available to the applicant to address comments that may arise during the Future Project Coordination phase?
If there are any remarks from the Coordination Office, the applicant can address them using the following options:
● (Delete the rejected work site): The applicant can remove the rejected site while keeping the approved ones and their associated data.
● (Replace the rejected work site): The applicant can substitute the rejected work site with another by uploading a new Shape File of the revised location while keeping the approved sites and related data.
● (Replace the entire excavation plan): In this case, all project work sites, including approved ones, are deleted. A new Shape File containing all project work sites must be uploaded, along with re-entering all relevant data, requiring the full coordination process to be restarted.
● (Delete the rejected work site): The applicant can remove the rejected site while keeping the approved ones and their associated data.
● (Replace the rejected work site): The applicant can substitute the rejected work site with another by uploading a new Shape File of the revised location while keeping the approved sites and related data.
● (Replace the entire excavation plan): In this case, all project work sites, including approved ones, are deleted. A new Shape File containing all project work sites must be uploaded, along with re-entering all relevant data, requiring the full coordination process to be restarted.
FAQ
What happens after the corrective period for the Building Compliance Certificate expires?
If the corrective period expires, the owner will receive a violation notice and be granted a one-month grace period for correction. If non-compliance persists, a fine between SAR 1,000 - 5,000 will be imposed.
FAQ
Can excavation begin upon obtaining a Multiple Excavation Coordination Report?
No, the Multiple Excavation Coordination Report is not an excavation permit but rather a confirmation that coordination has been completed. The service provider must still pay the fees and obtain a pre-coordinated excavation permit for each excavation listed in the coordination report.
FAQ
What is the purpose of multiple excavation coordination if the issued coordination report does not serve as an excavation permit?
The goal is to reduce the time required for issuing excavation permits. Once a multiple excavation coordination report is issued for several excavation sites, there will be no need to redo the coordination when applying for a pre-coordinated excavation permit.
FAQ
How can I print the Building Compliance Certificate?
There are two methods:
1. Through an engineering office: The office logs into Balady Business, views completed applications, selects the compliance certificate request, and prints the certificate.
2. Through the beneficiary: The user logs into the Balady mobile application, navigates to "My Requests", selects the compliance certificate request, and downloads the attached certificate.
1. Through an engineering office: The office logs into Balady Business, views completed applications, selects the compliance certificate request, and prints the certificate.
2. Through the beneficiary: The user logs into the Balady mobile application, navigates to "My Requests", selects the compliance certificate request, and downloads the attached certificate.
FAQ
What is the maximum total length of excavation paths for a single excavation?
The maximum total length of excavation paths for a single excavation is 1,000 linear meters.