Displayed 151 - 160 of 169
FAQ
What is the procedure when buying a house with an expired building permit, and you want to transfer the license in my name? Is the renewal for the first property owner?
You can apply for the building permit ownership transfer service through the Balady site.
FAQ
What is the procedure when the customer wants to modify the components of an old building that does not have a building permit?
Old buildings that do not have permits can apply for the service of issuing a permit to correct the status of an existing building, after issuing a cadastral decision for the same purpose.
FAQ
What is the procedure when the customer wants to modify the components of an old building that does not have a building permit?
Old buildings that do not have permits can apply for the service of issuing a permit to correct the status of an existing building, after issuing a cadastral decision for the same purpose.
FAQ
What is the purpose of the Saudi Building Code?
Setting the minimum requirements and requirements that achieve safety through the durability, stability and stability of buildings and facilities, facilitating access to them and protecting lives and property from the dangers of fire, earthquakes and other risks associated with buildings.
FAQ
What is the Saudi Building Code?
A set of conditions and requirements and what follows from implementing regulations and appendices related to building and construction to ensure safety.
FAQ
What is the Saudi code for residential buildings?
A comprehensive code that combines everything related to residential buildings intended for one or two families, whose height does not exceed three floors.
FAQ
What is the solution for the appearance of a difference in the land area in the deed from the actual land area when requesting a cadastral decision?
To solve the problem, please provide us with a copy of the error screen and a copy of the instrument, through the technical support channels.
FAQ
What is the solution for the cadastral decision issued by the Municipality system not to appear on the Balady website?
There is a survey decision entry service at the engineering office to enter the old survey decisions issued by the GAM system.
FAQ
?What is the solution if the building contains an independent deed for each apartment
The landlords’ union must issue the certificate
FAQ
What is the solution if there is land on which there is a building permit and the land was sold to another person and the building is still on the same old license with a (building violation) issued on it for an amount of 3000 riyals?
Ownership of the license must be transferred immediately after the deed is cleared.