Search

  • Add to favourites
  • 0
    No votes submitted yet.
Displayed 401 - 410 of 428
Search
Order
FAQ

What is the procedure in the event of transfer of ownership and the identity of the new owner did not appear when inquiring about him in Balady site?

The owners must be registered on Balady site in order for the application to be sent to the new owner and the application procedures to be completed and approved.
FAQ

What is the procedure in the event that the cadastral decision of the land granted by the "Sakani" platform does not appear?

In order to be able to serve you better, please provide us with the following data: a copy of the contract, plan number, plot and coordinates, and if the application is sent from the "sakani" platform, it does not require the issuance of a survey decision in my country, but when applying through the client, it is required to issue a survey decision through the "balady" platform.
FAQ

What is the procedure taken when an application for issuing a commercial license is submitted and I do not find a building permit for the property presenter with the owner?

The owner of the building can apply for the service of correcting the status of a building, and after issuing the license, it can be attached to the application for issuing a commercial license because it is one of the basic requirements for issuing a commercial license.
FAQ

What is the procedure when a building permit is issued, and I want to add a role and delete a component?

You can amend the building permit after issuance by applying for the service of adding and amending building components.
FAQ

What is the procedure when a notification appears to the customer (the trade license number is wrong)?

Please enter as the applicant (owner/manager of a facility) in case the license is on a commercial register, and if the license is on a national ID, you can enter through (for myself).
FAQ

What is the procedure when the customer wants to modify the components of an old building that does not have a building permit?

Old buildings that do not have permits can apply for the service of issuing a permit to correct the status of an existing building, after issuing a cadastral decision for the same purpose.
FAQ

What is the procedure when the customer wants to modify the components of an old building that does not have a building permit?

Old buildings that do not have permits can apply for the service of issuing a permit to correct the status of an existing building, after issuing a cadastral decision for the same purpose.
FAQ

What is the purpose of the Saudi Building Code?

Setting the minimum requirements and requirements that achieve safety through the durability, stability and stability of buildings and facilities, facilitating access to them and protecting lives and property from the dangers of fire, earthquakes and other risks associated with buildings.
FAQ

What is the Saudi Building Code?

A set of conditions and requirements and what follows from implementing regulations and appendices related to building and construction to ensure safety.
  • 428 results found

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?
Please tell us why (select up to two options)
يرجى عدم تضمين معلومات شخصية أو مالية. سيتم إرسال تعليقك وتسجيله لغرض تحسين الخدمات في منصة بلدي
يرجى عدم تضمين معلومات شخصية أو مالية. سيتم إرسال تعليقك وتسجيله لغرض تحسين الخدمات في منصة بلدي
Enter the characters shown in the image.
1 visitors said yes from
1360681
1 responses
1360681