Search

  • Add to favourites
  • 0
    No votes submitted yet.
Displayed 101 - 110 of 428
Search
Order
FAQ

What is the procedure when the customer wants to modify the components of an old building that does not have a building permit?

Old buildings that do not have permits can apply for the service of issuing a permit to correct the status of an existing building, after issuing a cadastral decision for the same purpose.
FAQ

Can the license activity be modified?

Yes, the activity can be modified through the service (Modification of a Temporary License for a Mobile Store Outlet).
FAQ

Can the license be revoked?

The license can be canceled through the service (cancellation of a temporary license for a mobile store outlet).
FAQ

What is the procedure if there are no engineering offices close to the client?

The engineering offices are now fully classified throughout the Kingdom and are not limited to the scope of the Municipality only
FAQ

Is the engineering office classified?

The classification of the engineering office can be checked through the Engineering Offices System > Classified Engineering Offices in the Baladi platform.
FAQ

Is it possible to modify the license after submitting the application?

Yes, the license can be modified after submitting the application.
FAQ

What is the procedure if the engineering office data is incorrect?

so that we can serve you better; Please provide us with the following data: the name of the office, the name of the office owner, the engineering license number, and copies of the required attachments.
FAQ

What is the procedure in the event that the cadastral decision of the land granted by the "Sakani" platform does not appear?

In order to be able to serve you better, please provide us with the following data: a copy of the contract, plan number, plot and coordinates, and if the application is sent from the "sakani" platform, it does not require the issuance of a survey decision in my country, but when applying through the client, it is required to issue a survey decision through the "balady" platform.
FAQ

I have an old survey decision, is it valid, or do I need a new survey decision?

The validity period of the cadastral decision is 3 years. In the event that the validity period expires, you can apply for another cadastral decision for the same purpose to be applied for.
FAQ

Does the authorization cancellation service in my country include (authorization to the engineering office)?

It does not include the electronic municipal authorization service (authorization to the engineering office).
  • 428 results found

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?
Please tell us why (select up to two options)
يرجى عدم تضمين معلومات شخصية أو مالية. سيتم إرسال تعليقك وتسجيله لغرض تحسين الخدمات في منصة بلدي
يرجى عدم تضمين معلومات شخصية أو مالية. سيتم إرسال تعليقك وتسجيله لغرض تحسين الخدمات في منصة بلدي
Enter the characters shown in the image.
1 visitors said yes from
1360477
1 responses
1360477