Search

  • حفظ الصفحة
  • 0
    No votes submitted yet.
Displayed 141 - 150 of 191
Search
تاريخ التحديث
FAQ

What is meant by a "route"?

A route is a designated extended area along a street that includes parking spaces for a limited number of mobile carts. The municipality defines and determines the maximum capacity for each route.
FAQ

What is the "Adding Technical Institute Graduates" screen?

This feature was added to enable accredited institute representatives to register their trained graduates in the system.
FAQ

What is the "Adding Technical Institute Graduates" screen?

This feature was added to enable accredited institute representatives to register their trained graduates in the system.
FAQ

What is the cancellation service for a temporary license for a mobile store sales outlet?

This service allows the cancellation of a temporary sales outlet license within the
municipal incubators for commercial activities.
FAQ

?What is the Certificate of Building Compliance (CBC)

It is a periodic certificate issued to beneficiaries proving that buildings are free of the minimum limit of visual distortion, and adhere to the requirements and conditions contained in the Building Compliance Certificate Procedures Manual Draft
FAQ

What is the consequence of rejecting the authorization request by the delegate?

The authorization request is considered canceled, and if the delegate needs to be added to the same establishment, a new authorization request must be submitted by the account manager.
FAQ

What is the correct procedure for requesting a contract with an engineering office?

When the user clicks the "Request Contract with Office" button, the system redirects them to the Saudi Council of Engineers for contracting. This option only appears in the search results for engineering offices. Users can search for classified establishments using two methods:
1. Basic Search: Search for classified establishments by: (Certificate number, Engineering license number, Contractor/engineering office name, Unified national number)
2. Advanced Search: If the above information is unavailable, search by: (Classification type (mandatory), Classification field (mandatory), City (mandatory)). The user can use additional filters for more precise results: (Establishment activity, Certificate grade, Certificate expiration date, Establishment phone number, Service).
FAQ

What is the correct procedure to request a contract with an engineering office?

When the user clicks (Request Contract with Office), the system redirects to the Saudi Council of Engineers for contracting. This option appears only in search results for engineering offices.
FAQ

?What is the difference between a building occupancy certificate and a compliance certificate

The building compliance certificate is a periodic certificate concerned with some requirements for the site, the building, and the manifestations of visual distortion, while the occupancy certificate is a one-time certificate concerned with verifying the
FAQ

What is the difference between major projects and unscheduled projects?

The difference is that unscheduled projects follow these specific procedures:
● Emergency project coordination requests can be submitted at any time during the calendar year.
● Project right-of-way maintenance is required.
● The Mayor’s approval is required based on the municipality’s settings.

نوع المحتوى

Content

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?

Please tell us why (select up to two options)

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Enter the characters shown in the image.
1 visitors said yes from
1434632
1 responses
1434632