Displayed 121 - 130 of 191
FAQ
Is there an SMS feature through which the beneficiary is notified of the status of his application?
The Balady platform offers the capability to send SMS notifications to beneficiaries at various stages and for specific aspects of the service, thereby enhancing the interactive experience for users.
FAQ
?May the ownership of the Building Compliance Certificate be transferred
The ownership may be transferred if the certificate is valid.
FAQ
?There is an old commercial building located in the priority areas, and some elements cannot be addressed, so what is the solution
The landlord shall coordinate with the engineering office to find engineering solutions and address the elements of the CBC Certificate.
FAQ
?What are the Building Compliance Certificate requirements
A building license, a title deed, a deed of ownership, a municipal investment contract, or an electricity or water bill for the building.
FAQ
What are the common criteria among emergency, scheduled, and unscheduled projects?
Major projects share the following criteria, with varying values depending on each project:
● Project area
● Number of floors
● Project budget
● Project area
● Number of floors
● Project budget
FAQ
What are the conditions for reserving a site for a mobile cart license?
● The mobile cart license must be valid (not expired or canceled).
● The current site reservation must be valid (not expired or canceled).
● The current site reservation must be valid (not expired or canceled).
FAQ
What are the consequences of canceling the Project Coordination Report?
After the coordination report is canceled, the following occurs:
● The project owner is notified of the cancellation.
● Printing of the coordination report is no longer available.
● The project site becomes available for coordination requests from other entities (government or private sector).
● The canceled report cannot be used to obtain a building permit.
● The project owner is notified of the cancellation.
● Printing of the coordination report is no longer available.
● The project site becomes available for coordination requests from other entities (government or private sector).
● The canceled report cannot be used to obtain a building permit.
FAQ
What are the fees for canceling a mobile cart license that expired after 06/ Jumada Al-Awwal / 1442H (21/Dec/2020)?
Fees include:
○ Non-renewal penalty (500 SAR) + Inspection fee (20 SAR) – one-time
charge
○ ((Signboard fee + 200 SAR) * (1 year))
○ Non-renewal penalty (500 SAR) + Inspection fee (20 SAR) – one-time
charge
○ ((Signboard fee + 200 SAR) * (1 year))
FAQ
What are the mandatory fields required to inquire about the cadastral report?
The mandatory fields include the cadastral report number (whether issued by Balady
or the Municipality), the owner’s ID type, and the owner’s ID number.
or the Municipality), the owner’s ID type, and the owner’s ID number.
FAQ
What are the requirements for adding a consultant to the project team?
To add a consultant to the permit request team, the following requirements must be
met:
● Verification of a valid and active engineering consultancy office license
number.
● Verification of a valid and active National Establishment Number (700) for the
engineering consultancy office.
● Verification of the consultant's classification validity.
● The consultant must be approved by the Coordination Office.
met:
● Verification of a valid and active engineering consultancy office license
number.
● Verification of a valid and active National Establishment Number (700) for the
engineering consultancy office.
● Verification of the consultant's classification validity.
● The consultant must be approved by the Coordination Office.