1. Select the applicant's role.
2. Choose the preliminary approval decision.
3. Select the engineering office to be authorized.
4. Attach the required documents.
5. Sign the ownership declaration.
1. A preliminary approval decision issued by the municipality.
2. A valid electronic title deed updated by the Ministry of Justice.
3. An electronic title deed approved for planning by the Ministry of Justice.
4. A preliminary approved land scheme drawing.
5. A contract with an engineering office.
6. A conceptual design.
7. Requirements from service authorities.