1. Enter the mobile number linked with (Absher).
2. Select the applicant’s role.
3. Select the survey document.
4. Select the engineering office to be authorized.
5. Attach the required documents.
6. Sign the ownership declaration.
1. Issuance of a survey document with the purpose of (approving a private plan).
2. A valid electronic title deed updated by the Ministry of Justice.
3. An electronic title deed authorized for planning by the Ministry of Justice.
4. The landuse must not be agricultural.
5. Contract with an engineering office.
6. Conceptual design.
7. Soil study.
8. Hydrological study.