Adding and Modifying Building Components

  • حفظ الصفحة
  • Add to favourites
  • 52.7
    (46 votes)
Adding and Modifying Building Components
  • Construction licenses
  • Individuals
  • Government agencies
  • Real estate
  • Engineering offices
  • Facilities

An electronic service available on the Balady platform, allowing users to add, modify, or remove building components from their existing building permit without the need to visit the authority.

service level agreement

  • Log in to the Balady platform through the Unified National Access (Absher).
  • Select the type of owner and applicant.
  • Choose the building permit for which you wish to issue a modification.
  • Select the design engineering office (certified designer) or retrieve it from the insurance if applicable.
  • Select the supervising engineering office or retrieve it from the insurance.
  • Select the construction contractor or retrieve it from the insurance.
  • Submit the application to the engineering office.
  • The engineering office will complete the required data and prepare the necessary plans.
  • A payment invoice will be issued.
  • After payment is completed, the modified permit will be issued and can be printed.
  • Contracting with an engineering office.
  • Payment of service fees.
  • Possession of a valid building permit.

Review the list of mandatory requirements and government approvals based on the type of activity.

Read the executive instructions of the list of fines and penalties for municipal violations.

الاسئلة الشائعة
I have been issued a building permit and now wish to add a floor and remove a component (e.g., a rooftop annex). What should I do?
You can modify the building permit after issuance by applying for the Addition and Modification of Building Components service.
What is the procedure when a building permit is issued, and I want to add a role and delete a component?
You can amend the building permit after issuance by applying for the service of adding and amending building components.
What are the conditions for modifying housing units from two to three units?
There are no requirements, and the modification is done through the service of adding and modifying building components.
How are car parks added to the license?
Car parks are considered within the building components (car parks) and are not a separate license. You can apply for the service of adding and modifying building components.
How are car parks added to the license?
Car parks are considered within the building components (car parks), and it is not a separate license, and you can apply for the service of adding and modifying building components.
What is the procedure when the customer wants to modify the components of an old building that does not have a building permit?
Old buildings that do not have permits can apply for the service of issuing a permit to correct the status of an existing building, after issuing a cadastral decision for the same purpose.
A building permit has been issued, and I want to add a role and delete a component, which is the appendix. What should I do?
You can amend the building permit after issuance by applying for the service of adding and amending building components.
Log in to post comments
no comments
Individuals, Governmental Entities, Establishments
Target audience
1 - 10 Days
Service duration
Submit electronically only through Balady portal, Mobile
Service channels
Service release date
Construction licenses
Product
عربي
لغات تقديم الخدمة
Service Cost
Service Cost
متوفر

Payment Channels

  • Sadad

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?
1 visitors said yes from
1368975
1 responses
1368975
Sign language button For Deaf