Search

  • Save Page
  • 0
    No votes submitted yet.
Displayed 301 - 310 of 807
Search
تاريخ التحديث
Order
FAQ

What is the acceptable spacing between excavation paths within a single excavation site?

The acceptable distance between excavation paths within a single site is 50 meters.
FAQ

What are the stages of monitoring an emergency excavation?

● Initiation of emergency works
● Completion of emergency works
FAQ

How can I activate a new service or coordination entity in excavation permit requests if it is related to infrastructure extension projects?

To activate a new entity in excavation permits, you must contact the Infrastructure Project Coordination Office within the relevant municipality.
FAQ

As a service entity, I have multiple representatives, each with a distinct role. Can I assign separate roles to my representatives in the coordination office?

Yes, the platform allows service and coordination entities to assign multiple representatives, each with a specific role. Examples include:
1. Filling out applications only (without submission).
2. Filling out and submitting applications.
3. Viewing applications submitted by other representatives.
4. Defining the project team within the coordination office (contractors – consultants – supervisors).
5. Responding to incoming coordination requests.
6. Responding to approval requests.
FAQ

What is the Multi-Building Connection Excavation Permit service?

This service allows service providers across the Kingdom (e.g., telecommunications, electricity, and water companies) to request a new type of excavation permit (Multi-Building Connection Excavation Permit), covering multiple building connections. The process includes coordination, approval, permit issuance, excavation execution, and site closure.
FAQ

What are the key requirements for applying for a Multi-Building Connection Excavation Permit?

The key requirements include:
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
FAQ

Will an entire project be rejected if some excavation sites receive remarks, or can the applicant modify and resubmit the request?

Some excavation sites may be accepted while others are rejected, with feedback provided to the project owner. The applicant will have the option to address the remarks and resubmit the request for reconsideration.
FAQ

What options are available to the applicant to address comments that may arise during the Future Project Coordination phase?

If there are any remarks from the Coordination Office, the applicant can address them using the following options:
● (Delete the rejected work site): The applicant can remove the rejected site while keeping the approved ones and their associated data.
● (Replace the rejected work site): The applicant can substitute the rejected work site with another by uploading a new Shape File of the revised location while keeping the approved sites and related data.
● (Replace the entire excavation plan): In this case, all project work sites, including approved ones, are deleted. A new Shape File containing all project work sites must be uploaded, along with re-entering all relevant data, requiring the full coordination process to be restarted.
  • 807 results found

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Was this page useful?

Please tell us why (select up to two options)

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.