Displayed 61 - 70 of 103
FAQ
Is parking in front of the store calculated from the area of the store itself?
Yes, and it varies according to the requirements of the activities, so it is preferable to inquire about the requirements of the activities through the Balady site:
https://apps.balady.gov.sa//LicenseStandard/Default?sid=7010
https://apps.balady.gov.sa//LicenseStandard/Default?sid=7010
FAQ
Is the ATM setup fee calculated when renewing a building permit?
The incorporation fee is not calculated in the building permit renewal service, but rather it is calculated through the commercial license system.
FAQ
Is the commercial registration status verified?
Yes, the status of the commercial registration is checked, and in the event that the commercial registration is (cancelled / suspended / expired), the license cannot be added to the multiple renewal request.
FAQ
Is the fine repeated in the event of non-fencing?
Yes, the fine is imposed every two weeks as a minimum in the event of non-fencing.
FAQ
Is the QR code service specific to a specific activity?
QR code service includes all activities.
FAQ
Is there a fee for applying for the municipal service?
There may be fees for some classifications of municipal service applications, which are defined by the responsible employee in the concerned department, as the application will be canceled if the fees are not paid on time.
FAQ
Is there a specific QR code sticker specification?
The printing shall be at a height of one meter and 20 cm from the ground and shall be on a white sticker (3 meters) and shall be in a conspicuous place if the place is closed, so that it can be read, and shall be (15 cm).
FAQ
What are the conditions for modifying housing units from two to three units?
There are no requirements, and the modification is done through the service of adding and modifying building components.
FAQ
What are the requirements for a Certificate of Occupancy?
To issue a certificate of occupancy requires:
1- The existence of a previous license issued 6 months ago or more, and no occupancy certificate has been issued for it before.
2- Payment of service fees.
3- Contracting with an engineering office for non-residential uses.
4- Payment of violations.
1- The existence of a previous license issued 6 months ago or more, and no occupancy certificate has been issued for it before.
2- Payment of service fees.
3- Contracting with an engineering office for non-residential uses.
4- Payment of violations.
FAQ
What are the specifications of the land bound by fencing?
The vacant lands must be fenced according to the main axes targeted in the first phase in the five cities: (Riyadh, Makkah, Madinah, Dammam, Jeddah), which are specified on the geographical explorer on the Baladi platform https://balady.gov.sa//Services?id =237