Regulatory Requirements:

  • Coordination with all relevant authorities and obtaining government approvals electronically throughout the request process.
  • Full compliance with the "Traffic Control in Work Zones" guide and its updates issued by the Ministry of Municipal and Rural Affairs and Housing.
  • Full compliance with the "Traffic Control in Work Zones" guide and its updates issued by the Ministry of Transport.
  • Full compliance with the "General Specifications for Civil Works in Public Utility Projects" guide issued by the Ministry of Municipal and Rural Affairs and Housing in 1440 AH.
  • Full compliance with the "Road Cross-Section" guide and its updates issued by the Ministry of Municipal and Rural Affairs and Housing.
  • Full compliance with the "Street and Square Lighting" guide and its updates issued by the Ministry of Municipal and Rural Affairs and Housing.
  • Access the "Guidelines for the Use of Temporary Barriers in Work Zones" via the provided link.

Notes / Alerts

  • The presence of subcontractors does not exempt the main contractor from liability for violations during site preparation, excavation, or post-closure.
  • Failure to pay the required fees on time will result in request cancellation.
  • You can watch the video tutorial on how to request a pre-coordinated excavation permit via the provided link.

Comprehensive Guide to Civil Works for Infrastructure 2024-1446 (First Edition)

تعليقات واقتراحات

لأي استفسار أو تعليق على الخدمات البلدية، يرجى ملئ المعلومات المطلوبة

تواصل معنا

تاريخ آخر تحديث: - المملكة العربية السعودية
هل استفدت من المعلومات المقدمة في هذه الصفحة؟
أضف السبب (اختر من خيار واحد او أكثر)

يرجى عدم تضمين معلومات شخصية أو مالية. سيتم إرسال تعليقك وتسجيله لغرض تحسين الخدمات في منصة بلدي

يرجى عدم تضمين معلومات شخصية أو مالية. سيتم إرسال تعليقك وتسجيله لغرض تحسين الخدمات في منصة بلدي

Enter the characters shown in the image.
لا يوجد تقييمات الى الآن