Search

  • Save Page
  • 0
    No votes submitted yet.
Displayed 881 - 890 of 1049
Search
تاريخ التحديث
FAQ

What health certificate services have been recently developed or modified?

● Issuance of a Health Certificate
● Cancellation of a Health Certificate
● Renewal of a Health Certificate
FAQ

What if a user wants to cancel a submitted classification request?

Yes, it can be canceled only if the technical or credit evaluation has not been completed.
Steps:

Access the Balady platform

Go to “My Requests”

Cancel the request
Note: Once both evaluations are complete and the certificate is issued, cancellation is not possible.
FAQ

What information is required to request classification for engineering consultancy offices?

"The following must be available:

A valid commercial registration that includes classified activities for engineering offices.

Engineering office license for companies and engineering consultancy offices.

Financial statements deposited in the “Qawaem” program.

Certificate of compliance with technical standards from the Saudi Council of Engineers."
FAQ

What information is required to request contractor classification?

"The following must be available:

A valid commercial registration that includes classified activities.

Financial statements deposited in the “Qawaem” program.

Certificate of compliance with technical standards from the entity providing the technical grade based on the classification field."
FAQ

What is a site preparation permit?

A permit that allows beneficiaries to prepare and level a site before construction.
FAQ

What is a transaction inquiry service?

It is a service that enables beneficiaries to inquire about the administrative communication transactions that exist in the correspondence system at the level of the ministry and the secretariats that follow the ministry through linking with the central administrative communication system in the ministry (correspondence).
FAQ

What is an occupancy certificate?

A building occupancy certificate is a certificate that confirms the actual completion of buildings and is issued by the competent authorities.
FAQ

What is meant by a "route"?

A route is a designated extended area along a street that includes parking spaces for a limited number of mobile carts. The municipality defines and determines the maximum capacity for each route.
FAQ

What is meant by coordination and approval entities?

These are relevant entities that must be consulted for opinions on major project coordination. Their input may directly impact the approval or rejection of the request, categorizing them as an approval entity, or it may be advisory only, categorizing them as a coordination entity. Usually, coordination entities are the same as project-owning entities. Approval entities may vary depending on the nature of the request and the main municipality, but the (Project Coordination Office) remains the primary approval entity for all types of requests.
FAQ

What is meant by fencing the earth into space?

It is for the landowner to issue a license for fencing a vacant land and fencing the land belonging to him in accordance with the (Guideline for fencing vacant lands) issued by the Ministry of Municipalities & Housing (https://balady.gov.sa/Services/DownloadUserGuide/364).
  • 1049 results found

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?

Please tell us why (select up to two options)

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.

Please do not include personal or financial information. Your comment will be sent and recorded for the purpose of improving the services on balady platform.