Search

  • حفظ الصفحة
  • 0
    No votes submitted yet.
Displayed 701 - 710 of 816
Search
تاريخ التحديث
FAQ

What is meant by the "distinctive mark" in a seasonal permit application?

The applicant must enter a description of the seasonal permit location or provide a distinctive mark for the site.
FAQ

What is required to quickly process a communication?

The availability of sufficient justifications that necessitate the submission of the communication, with the need for accuracy and validity of the data, especially the location of the communication, and the classification corresponding to the monitored case contributes to resolving deficiencies effectively and quickly.
FAQ

What is the acceptable spacing between excavation paths within a single excavation site?

The acceptable distance between excavation paths within a single site is 50 meters.
FAQ

What is the "Adding Technical Institute Graduates" screen?

This feature was added to enable accredited institute representatives to register their trained graduates in the system.
FAQ

What is the cancellation service for a temporary license for a mobile store sales outlet?

This service allows the cancellation of a temporary sales outlet license within the
municipal incubators for commercial activities.
FAQ

?What is the Certificate of Building Compliance (CBC)

It is a periodic certificate issued to beneficiaries proving that buildings are free of the minimum limit of visual distortion, and adhere to the requirements and conditions contained in the Building Compliance Certificate Procedures Manual Draft
FAQ

What is the consequence of rejecting the authorization request by the delegate?

The authorization request is considered canceled, and if the delegate needs to be added to the same establishment, a new authorization request must be submitted by the account manager.
FAQ

What is the correct procedure for requesting a contract with an engineering office?

When the user clicks the "Request Contract with Office" button, the system redirects them to the Saudi Council of Engineers for contracting. This option only appears in the search results for engineering offices. Users can search for classified establishments using two methods:
1. Basic Search: Search for classified establishments by: (Certificate number, Engineering license number, Contractor/engineering office name, Unified national number)
2. Advanced Search: If the above information is unavailable, search by: (Classification type (mandatory), Classification field (mandatory), City (mandatory)). The user can use additional filters for more precise results: (Establishment activity, Certificate grade, Certificate expiration date, Establishment phone number, Service).
FAQ

What is the correct procedure to request a contract with an engineering office?

When the user clicks (Request Contract with Office), the system redirects to the Saudi Council of Engineers for contracting. This option appears only in search results for engineering offices.

نوع المحتوى

Content

المنتج

Products

Common Questions

Initiative Tags

Initiatives

News Tags

  • 816 results found

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?
1 visitors said yes from
1465944
1 responses
1465960
Sign language button For Deaf