Displayed 691 - 700 of 807
FAQ
What is the benefit of the classification system for the labor market?
The Contractor Classification System and its regulations are key reform tools. It is one of the main standards used in selecting contractors for government project awards. The system aims to assess contractors’ financial, technical, administrative, and execution capabilities to place them in an appropriate classification grade and field. It is also closely linked to the Government Tenders and Procurement Law and its executive regulations.
FAQ
What is the cancellation service for a temporary license for a mobile store sales outlet?
This service allows the cancellation of a temporary sales outlet license within the
municipal incubators for commercial activities.
municipal incubators for commercial activities.
FAQ
?What is the Certificate of Building Compliance (CBC)
It is a periodic certificate issued to beneficiaries proving that buildings are free of the minimum limit of visual distortion, and adhere to the requirements and conditions contained in the Building Compliance Certificate Procedures Manual Draft
FAQ
What is the Classification Service?
It is a service provided by the Ministry of Municipal and Rural Affairs and Housing that aims to support and qualify private sector entities and enhance their capabilities. This is done by meeting a minimum set of financial, technical, administrative, and operational standards to ensure the entity’s ability to deliver services in cities across the Kingdom by obtaining a Classification Certificate.
FAQ
What is the consequence of rejecting the authorization request by the delegate?
The authorization request is considered canceled, and if the delegate needs to be added to the same establishment, a new authorization request must be submitted by the account manager.
FAQ
What is the correct procedure for requesting a contract with an engineering office?
When the user clicks the "Request Contract with Office" button, the system redirects them to the Saudi Council of Engineers for contracting. This option only appears in the search results for engineering offices. Users can search for classified establishments using two methods:
1. Basic Search: Search for classified establishments by: (Certificate number, Engineering license number, Contractor/engineering office name, Unified national number)
2. Advanced Search: If the above information is unavailable, search by: (Classification type (mandatory), Classification field (mandatory), City (mandatory)). The user can use additional filters for more precise results: (Establishment activity, Certificate grade, Certificate expiration date, Establishment phone number, Service).
1. Basic Search: Search for classified establishments by: (Certificate number, Engineering license number, Contractor/engineering office name, Unified national number)
2. Advanced Search: If the above information is unavailable, search by: (Classification type (mandatory), Classification field (mandatory), City (mandatory)). The user can use additional filters for more precise results: (Establishment activity, Certificate grade, Certificate expiration date, Establishment phone number, Service).
FAQ
What is the correct procedure to request a contract with an engineering office?
When the user clicks the “Request Contract with Office” button, the system redirects the user to the Saudi Council of Engineers to initiate the contract. Only engineering offices appear in the search results.
FAQ
What is the correct procedure to request a contract with an engineering office?
When the user clicks (Request Contract with Office), the system redirects to the Saudi Council of Engineers for contracting. This option appears only in search results for engineering offices.
FAQ
?What is the difference between a building occupancy certificate and a compliance certificate
The building compliance certificate is a periodic certificate concerned with some requirements for the site, the building, and the manifestations of visual distortion, while the occupancy certificate is a one-time certificate concerned with verifying the
FAQ
What is the difference between major projects and unscheduled projects?
The difference is that unscheduled projects follow these specific procedures:
● Emergency project coordination requests can be submitted at any time during the calendar year.
● Project right-of-way maintenance is required.
● The Mayor’s approval is required based on the municipality’s settings.
● Emergency project coordination requests can be submitted at any time during the calendar year.
● Project right-of-way maintenance is required.
● The Mayor’s approval is required based on the municipality’s settings.