Search

  • Add to favourites
  • 0
    No votes submitted yet.
Displayed 381 - 390 of 428
Search
Order
FAQ

What are the stages of applying for the service of issuing a building permit?

In the event that there is a cadastral decision sourced from my country, the application is made on Baladi Services > Construction Permits Services > Issuing a Building Permit Service > Selecting the cadastral decision to apply for > Fill in the required data and send a request to a classified engineering office.
FAQ

?What are the standards for CBC

Standards are outlined in the Building Compliance Certificate Procedures Manual Draft.
FAQ

What are the steps to submit a complaint?

1. Login to the baladi app / baladi portal.
2. Choose the communications service, then select the type of communication.
3. Locate and confirm the communication.
4. Determine the appropriate classification (lighting - roads and sidewalks).
5. Enter the communication description.
6. Attach one or more photos showing the current situation.
7. Acknowledgment of the validity of the data and then sending the communication.
8. Receipt of a message with the communication number.
FAQ

What does construction license mean?

It is a service that allows citizens to submit a request to issue a building permit and follow up on all application cases through the online portal of the Baladi platform, interact with the applicant via SMS at all stages of issuing the permit and print the permit electronically.
FAQ

What is a transaction inquiry service?

It is a service that enables beneficiaries to inquire about the administrative communication transactions that exist in the correspondence system at the level of the ministry and the secretariats that follow the ministry through linking with the central administrative communication system in the ministry (correspondence).
FAQ

What is an occupancy certificate?

A building occupancy certificate is a certificate that confirms the actual completion of buildings and is issued by the competent authorities.
FAQ

What is meant by fencing the earth into space?

It is for the landowner to issue a license for fencing a vacant land and fencing the land belonging to him in accordance with the (Guideline for fencing vacant lands) issued by the Ministry of Municipalities & Housing (https://balady.gov.sa/Services/DownloadUserGuide/364).
FAQ

What is required to quickly process a communication?

The availability of sufficient justifications that necessitate the submission of the communication, with the need for accuracy and validity of the data, especially the location of the communication, and the classification corresponding to the monitored case contributes to resolving deficiencies effectively and quickly.
FAQ

?What is the Certificate of Building Compliance (CBC)

It is a periodic certificate issued to beneficiaries proving that buildings are free of the minimum limit of visual distortion, and adhere to the requirements and conditions contained in the Building Compliance Certificate Procedures Manual Draft
  • 428 results found

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

Contact Us

Last update date: - Saudi Arabia
Was this page useful?
Please tell us why (select up to two options)
يرجى عدم تضمين معلومات شخصية أو مالية. سيتم إرسال تعليقك وتسجيله لغرض تحسين الخدمات في منصة بلدي
يرجى عدم تضمين معلومات شخصية أو مالية. سيتم إرسال تعليقك وتسجيله لغرض تحسين الخدمات في منصة بلدي
Enter the characters shown in the image.
1 visitors said yes from
1360701
1 responses
1360731