Displayed 201 - 210 of 965
FAQ
What are the mandatory fields required to inquire about the cadastral report?
The mandatory fields include the cadastral report number (whether issued by Balady
or the Municipality), the owner’s ID type, and the owner’s ID number.
or the Municipality), the owner’s ID type, and the owner’s ID number.
FAQ
What are the mandatory details required to inquire about a building permit?
The permit number (issued by Balady or the municipality), the owner’s identification type, and the owner’s identification number.
FAQ
What are the main tasks that can be carried out through the Residential Contract Services?
The services cover multiple tasks such as creating and activating residential contracts, developing operational plans for contracts, monitoring contracts based on their status (inactive, pending activation, active, expired, rejected), reviewing performance reports, managing complaints and violations, and configuring contract settings.
FAQ
What are the key requirements for applying for a Multi-Building Connection Excavation Permit?
The key requirements include:
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
1. Defining the main excavation route and all building connections.
2. For each building, the short address or building number must be entered, along with an image of the building.
3. Excavation paths must remain within the designated geographic scope of the buildings.
4. The number of connections must not exceed 80.
5. The length of each connection must not exceed 25 meters.
6. The total length of the main excavation route must not exceed 1,000 meters
FAQ
What are the key factors contributing to raising the classification score?
"Several key factors help increase the score, such as:
The number of employees in the establishment (depending on the role in the classification sector),
Their experience,
The percentage of Saudi employees,
The percentage of Saudi women,
Administrative governance and risk management,
Diversified income sources,
Use of modern technologies in projects."
The number of employees in the establishment (depending on the role in the classification sector),
Their experience,
The percentage of Saudi employees,
The percentage of Saudi women,
Administrative governance and risk management,
Diversified income sources,
Use of modern technologies in projects."
FAQ
What are the fields in which companies and institutions are classified?
The fields that require classification include:
Construction and Building
Operation, Maintenance, and Services
Exhibitions and Conferences
Catering and Food Services
Real Estate Development
Communications and Information Technology
Engineering Offices
Surveying and Geospatial
Cybersecurity
Construction and Building
Operation, Maintenance, and Services
Exhibitions and Conferences
Catering and Food Services
Real Estate Development
Communications and Information Technology
Engineering Offices
Surveying and Geospatial
Cybersecurity
FAQ
What are the fields and activities included in the classification of the engineering consultancy offices sector?
"All engineering consultancy activities licensed by the Saudi Council of Engineers.
FAQ
What are the fees for canceling a mobile cart license that expired after 06/ Jumada Al-Awwal / 1442H (21/Dec/2020)?
Fees include:
○ Non-renewal penalty (500 SAR) + Inspection fee (20 SAR) – one-time
charge
○ ((Signboard fee + 200 SAR) * (1 year))
○ Non-renewal penalty (500 SAR) + Inspection fee (20 SAR) – one-time
charge
○ ((Signboard fee + 200 SAR) * (1 year))
FAQ
What are the criteria for obtaining the Classification Certificate?
The criteria include:
Meeting the financial standards of the entity.
Meeting the technical standards of the entity.
Meeting the financial standards of the entity.
Meeting the technical standards of the entity.
FAQ
What are the consequences of canceling the Project Coordination Report?
After the coordination report is canceled, the following occurs:
● The project owner is notified of the cancellation.
● Printing of the coordination report is no longer available.
● The project site becomes available for coordination requests from other entities (government or private sector).
● The canceled report cannot be used to obtain a building permit.
● The project owner is notified of the cancellation.
● Printing of the coordination report is no longer available.
● The project site becomes available for coordination requests from other entities (government or private sector).
● The canceled report cannot be used to obtain a building permit.